1. Ceilings - 15000 PLN
2. Floor Tiles hall stairs,  only work  - 5300
3. Bathrooms sinks. pisuars.  WC - 4200
4. VINYL PANEL FLOOR- 16000
5. Doors inside- PORTA- 15pcs - 14000PLN
6. Central Ventilation - 12500 PLN
7. Painting - 3400 PLN
8. Kitchen Tiles and work  -3000
9. Electrical equipment + lamps - 4500
10. WALLS plaster  - 18000
11. Bathroom wall  dividers - 4400
 
sum:  100.300 PLN
 
 
OUTSIDE
1. Doors (2pcs ) - 8300 PLN
2. Heating Pump - 45000 PLN
3. Providing Water (100m) - 11000
4. Draining System - 8000PLN
5. WATER Harvesting system, Rain water system  - 12000PLN
 
 
SUM: 43800 PLN
 
OUTSIDE INSIDE SUM : 144.100PLN
 
At this moment we have ca 80.000 PLN
 
Greetings
 
Zbyszek Hanaczewski
 

** Note: The difference of 64,000 PLN is roughly $17,000.

Saturday, June 15, 2019

Lubin Church Building Update
14 June, 2019
Dear Friends,
Greetings from Lubin, Poland! As most of you know through various posts and newsletters, the Lubin Baptist Church some years ago received land from the city for 1 % of it’s value. Seeing that God had given a gift of immense value, the church decided unanimously to step out in faith and start building a physical building that could be used for Sunday worship services as well as to train and equip believers. It is also a tool to be used as a community and language center where people can come and be exposed to the truth.
It has been an amazing journey where God has met the financial need to the point at where we are today. The building is structurally set up for two main functions: 1. Main meeting auditorium 2. Social side – to be used for our English Center, apartments, fellowship hall, kitchen and the possibility of having a fellowship hall for youth on the top floor.
The foundation has been laid, all the walls built, roof put on, most of the windows installed, a lot of the wiring put in, plumbing in, floor heating pipes in and the concrete floor has been poured on the social side. As I write this letter Insulation is being put in and plaster being applied to the walls.
This is good and we are moving forward, but the resources that we currently have will be depleted soon. We are currently scheduled to move into our new building, Lord willing by the middle of September. In order for us be able to do this, the following needs to be completed:
• Complete classrooms 1, 2,3 on the ground floor
• At least 2 of the 3 bathrooms completed
• Fellowship area – which will be used for temporary church services as well as a café and waiting area during the week for the “Logos” Language Center
• Halls, stairs and bathrooms tiled
• Classrooms either tiled or flooring laid
• Ceiling panels put in
• Lights installed
• Walls painted
I received an estimate of the cost for materials and labor: The estimate also includes some items for the next floor up as well – like bathrooms and or doors. Here is a financial estimate for the items needed for us to be able to have a smooth move.
MATERIALS AND LABOUR

INSIDE - ca 350m2
1. Ceilings - 15,000 PLN = $ 3,967.21
2. Floor Tiles - 28,000 PLN = $ 7,405.46
3. Bathrooms - 23,000 PLN = $ 6,083.06
4. Stairs (tiles) - 4,050 PLN = $ 1,071.15
5. Doors inside - 17pcs - 10,800 PLN = $ 2,856.39
6. Central Ventilation - 12,500 PLN = $ 3,306.01
Total: 93,350 PLN = $ 24,689.29
OUTSIDE
1. Doors (2 pcs) - 8,300 PLN = $ 2,195.19
2. Heating Pump - 45,000 PLN = $ 11,901.64
3. Providing Water (100m) - 11,000 PLN = $ 2,909.29
4. Draining System - 6,000 PLN = $1,586.89
5. Rain Water Harvesting system - 13,000 PLN = $ 3,438.25
Total: 83,300 PLN = $ 22,031.26
Total PLN = 176,650 PLN = $ 46,720.54

Paul Eager

Wednesday, February 13, 2019

How to help

We believe this is God's work, so we ask that you do only what He directs. Of course, prayer is vital, and always in His will. If you feel led to give financially, here is the link. After you log in, choose

6434-905-Church Building Fund - Poland

If He directs you to help physically with skilled labor, then please contact us via email (b.thomas@worldventure.net). May God bless you as you follow His leading.

Friday, September 8, 2017

Breakdown of costs 2017

Here are the latest figures for what is needed to enclose the building before winter. Thanks for praying about what you can do.

74,000 zł ($20,881.61) – For the wood frame and roof
27,000 zł ($7,618.96 ) – Windows in the social part (24 windows @ $317.46) 
15,000 zł ($4,232.75) – Windows for the auditorium (9 windows @ $470 including electric shades)



Pictures



























How to Help

We believe this is God's work, so we ask that you do only what He directs. Of course, prayer is vital, and always in His will. If you feel led to give financially, here is the link. After you log in, choose

6434-905-Church Building Fund - Poland

If He directs you to help physically with skilled labor, then please contact us via email (b.thomas@worldventure.net). May God bless you as you follow His leading.